AMERICAN ENERGY ATLAS
Power·Alaska

Yakutat

Yakutat, Alaska · operated by Alaska Village Elec Coop, Inc

2023 · headline year
Capacity in service3.8MW4 units · oil
Net generation6.24GWh2023 · reported
Rank in Alaska#74 (tied)of 142 · by capacity · #8,289 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor19%2023

Location

Yakutat

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 58,787 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

025,00050,00075,000201120172023
Reported (through 2023)

Generating units

9 of 9 shown · 3.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 61.2Distillate oilPetroleum Liquids2007Operating
Unit 71.2Distillate oilPetroleum Liquids2012Operating
Unit 2B0.8Distillate oilPetroleum Liquids1999Operating
Unit 3A0.6Distillate oilPetroleum Liquids1999Operating
Unit 41.1Distillate oilPetroleum Liquids1973Retired 1993
Unit 4A1.1Distillate oilPetroleum Liquids1993Retired 2014
Unit 2A0.8Distillate oilPetroleum Liquids1984Retired 1999
Unit 30.6Distillate oilPetroleum Liquids1973Retired 1999
Unit 50.3Distillate oilPetroleum Liquids1989Retired 2006

All 9 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Alaska Village Elec Coop, Inc
Entity type
Cooperative
Regulatory status
Regulated
EIA plant ID
6637

Common questions

How big is Yakutat?
3.8 MW across 4 generating units in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Alaska Village Elec Coop, Inc, filed as cooperative.
How old is it?
The capacity-weighted average megawatt here came online in 2006. The oldest operating units are Unit 2B and Unit 3A (1999); the newest is Unit 7 (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at Yakutat. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.

Related pages

Alaska energyAll facilities in the state→Purple Lake3.9 MW operating capacity→ False Island3.8 MW operating capacity→ King Cove3.3 MW operating capacity→ NSB Atqasuk Utility3.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming