Woodville, Tyler County, Texas · MISO · operated by East Texas Electric Coop, Inc
Capacity shown is planned or not in service · last reported to the EPA in 2016
Out of service
Out-of-service capacity49.9MW1 unit · none in service
CO₂ emittedNot reported2023 · last reported 2016
Reported suppliersNot reported2023
Location
CO₂ emitted, t · 2014–16
Reported (through 2016)
Generating units
1 of 1 shown · none in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit G1
49.9
Wood
Wood/Wood Waste Biomass
2014
Out of service
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.