Harrison County, West Virginia · PJM · operated by Wolf Summit Energy LLC
Capacity shown is planned or not in service
Proposed
A planned 579 MW natural gas fired combined cycle project, filed to come online in 2028.
Planned capacity579MW2 units · not yet in service
Reported suppliersNot reported2023
Location
Generating units
2 of 2 shown · none in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit HCCT1
371.5
Natural Gas
Natural Gas Fired Combined Cycle
2028
Proposed
Unit HCCA1
207.4
Natural Gas
Natural Gas Fired Combined Cycle
2028
Proposed
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.