Winchester Power Park

Winchester, Fayette County, Texas · ERCOT · operated by Lower Colorado River Authority · owned by Lower Colorado River Authority

2023 · headline year
Reported fuel cost$1.92M2023 · reported deliveries
Capacity in service242MW4 units · gas
Net generation86.2GWh2023 · reported
CO₂ emitted45,697t2023 · reported to EPA · 3,861st highest of 6,030 in the US
Rank in Texas#209of 941 · by capacity · #1,233 (tied) of 13,147 US
Reported suppliers42023 · 167 deliveries
Capacity factor4%2023

Location

Fayette County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 922,896 MMBtu · reported

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 242 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CGT160.5Natural GasNatural Gas Fired Combustion Turbine2010Operating
Unit CGT260.5Natural GasNatural Gas Fired Combustion Turbine2010Operating
Unit CGT360.5Natural GasNatural Gas Fired Combustion Turbine2010Operating
Unit CGT460.5Natural GasNatural Gas Fired Combustion Turbine2010Operating

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

1 of 4 suppliers · delivered in 2023
SupplierFuelDelivered MMBtuTonsMine of originTransport
DCPNatural gas639,572n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 765 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 4 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Lower Colorado River Authority · 100%
Operating utility
Lower Colorado River Authority
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000542
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
Gas pipeline
Energy Transfer Company Texas PL LTD
EIA plant ID
56674

Common questions

How big is Winchester Power Park?
242 MW across 4 generating units in service.
Who owns and operates it?
Owned by Lower Colorado River Authority (100%) and operated by Lower Colorado River Authority, filed as political subdivision.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. Every operating unit came online in 2010.
When is it due to retire?
No retirement date has been filed for any operating unit at Winchester Power Park. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 4 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $1.92M in 2023.
How much CO₂ does it emit?
45,697 t in 2023, reported to the EPA — the 3,861st highest of 6,030 US facilities that reported. Up from 38,615 t in 2011.

Related pages

Texas energyAll facilities in the state→El Campo Wind243 MW operating capacity→ Coyote Wind LLC242 MW operating capacity→ Sweetwater Wind 4 LLC241 MW operating capacity→ Eiffel Solar Project240 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming