AMERICAN ENERGY ATLAS
Power·Massachusetts

Williams College - Campus CHP

Berkshire County, Massachusetts · ISO-NE · operated by President & Trustees of Williams College

2023 · headline year
Fuel spend$1.14M2023 · estimate
Capacity in service7.0MW3 units · oil + gas
Net generation1.99GWh2023 · reported
Rank in Massachusetts#103 (tied)of 666 · by capacity · #6,147 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor3%2023

Location

Berkshire County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

98% Natural gas · 85,328 MMBtu · reported · $1.1M est.2% Oil & petroleum · 1,686 MMBtu · reported · $40,599 est.

Natural gas supplies 98% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2012–2023

0100,000200,000300,000201220182023
Reported (through 2023)

Generating units

5 of 5 shown · 7.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN23.0Natural GasNatural Gas Steam Turbine2003Operating
Unit GEN42.0Distillate oilPetroleum Liquids2017Operating
Unit GEN52.0Distillate oilPetroleum Liquids2017Operating
Unit GEN62.0Distillate oilPetroleum Liquidsnot reportedCanceled
Unit GEN31.2Natural GasNatural Gas Internal Combustion Enginenot reportedCanceled

All 5 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
President & Trustees of Williams College
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
58160

Common questions

How big is Williams College - Campus CHP?
7.0 MW across 3 generating units in service — 4.0 MW of oil and 3.0 MW of natural gas. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by President & Trustees of Williams College, filed as commercial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2011. The oldest operating unit is Unit GEN2 (2003); the newest are Unit GEN4 and Unit GEN5 (2017).
When is it due to retire?
No retirement date has been filed for any operating unit at Williams College - Campus CHP. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $1.14M in 2023 — natural gas $1.1M and oil & petroleum $40,599. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Massachusetts energyAll facilities in the state→Blacksmith Road Solar 17.0 MW operating capacity→ Kearsarge William Way7.0 MW operating capacity→ Riverside Holyoke6.9 MW operating capacity→ CED Northampton Solar LLC Hybrid6.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming