William C. Dale

Winchester, Clark County, Kentucky · PJM · operated by East Kentucky Power Coop, Inc

last reported to the EPA in 2016

Retired 2016

Retired — its last generating unit went out of service in 2016, ending 216 MW of capacity.

Retired capacity216MW4 units · none in service
CO₂ emittedNot reported2023 · last reported 2016
Reported suppliersNot reported2023 · last deliveries 2015

Location

Clark County · PJM · SERC

CO₂ emitted, t · 2011–16

0300,000600,000900,000201120142016
Reported (through 2016)

Generating units

4 of 4 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 381.0Bituminous coalConventional Steam Coal1957Retired 2016
Unit 481.0Bituminous coalConventional Steam Coal1960Retired 2016
Unit 127.0Bituminous coalConventional Steam Coal1954Retired 2015
Unit 227.0Bituminous coalConventional Steam Coal1954Retired 2015

All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 89 deliveries are on record for 2011–2015.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
East Kentucky Power Coop, Inc
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1005923
Balancing authority
PJM
NERC region
SERC
EIA plant ID
1385

Common questions

How big is William C. Dale?
216 MW across 4 units, none of which is in service — all retired.
Who owns and operates it?
Operated by East Kentucky Power Coop, Inc, filed as cooperative.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
When is it due to retire?
It has already retired — the last unit retired in 2016.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by bituminous coal.

Related pages

Kentucky energyAll facilities in the state→Unbridled SolarPower facility→ UnknownPower facility→ Waterside GTPower facility→ Webster County Coal, LLCIndustrial facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming