Wildwood Solar Plant

Tallahatchie County, Mississippi · MISO · operated by Wildwood Solar, LLC

Capacity shown is planned or not in service

Proposed

A planned 100 MW solar photovoltaic project, filed to come online in 2025.

Planned capacity100MW1 unit · not yet in service

Location

Tallahatchie County · MISO · SERC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit WLD100.0SolarSolar Photovoltaic2025Proposed

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit WLDnew unit2025100 MW

Ownership & operations

Operating utility
Wildwood Solar, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
SERC
EIA plant ID
68516

Common questions

How big is Wildwood Solar Plant?
100 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Wildwood Solar, LLC, filed as independent power producer.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
What does it run on?
Solar Photovoltaic (100 MW).

Related pages

Mississippi energyAll facilities in the state→Transco Station 77Industrial facility→ Trunkline Gas Co - ShawIndustrial facility→ Vicksburg Advanced Power StationPower facility→ WrightPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming