Stevenson, Jackson County, Alabama · TVA · operated by Tennessee Valley Authority
last reported to the EPA in 2016
Retired — its last generating unit went out of service in 2015, ending 1,969 MW of capacity.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 7 | 575.0 | Bituminous coal | Conventional Steam Coal | 1961 | Retired 2015 |
| Unit 8 | 550.0 | Bituminous coal | Conventional Steam Coal | 1965 | Retired 2015 |
| Unit 1 | 140.6 | Bituminous coal | Conventional Steam Coal | 1952 | Retired 2014 |
| Unit 2 | 140.6 | Bituminous coal | Conventional Steam Coal | 1952 | Retired 2014 |
| Unit 3 | 140.6 | Bituminous coal | Conventional Steam Coal | 1952 | Retired 2013 |
| Unit 4 | 140.6 | Bituminous coal | Conventional Steam Coal | 1953 | Retired 2014 |
| Unit 5 | 140.6 | Bituminous coal | Conventional Steam Coal | 1954 | Retired 2013 |
| Unit 6 | 140.6 | Bituminous coal | Conventional Steam Coal | 1954 | Retired 2014 |
All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.
See the delivery history →