AMERICAN ENERGY ATLAS
Power·California

Whittier LFG Power Plant #1

Los Angeles County, California · CAISO · operated by J&A-Whittier LLC

2023 · headline year
Capacity in service2.2MW2 units · biomass
Rank in California#1,205 (tied)of 1,713 · by capacity · #9,650 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Los Angeles County · CAISO · WECC

Reported fuel consumption, MMBtu · 2011–17

030,00060,00090,000201120142017
Reported (through 2017)

Generating units

2 of 2 shown · 2.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit EN011.1Landfill gasLandfill Gas2006Operating
Unit EN021.1Landfill gasLandfill Gas2010Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
J&A-Whittier LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
57102

Common questions

How big is Whittier LFG Power Plant #1?
2.2 MW across 2 generating units in service.
Who owns and operates it?
Operated by J&A-Whittier LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2008. The oldest operating unit is Unit EN01 (2006); the newest is Unit EN02 (2010).
When is it due to retire?
No retirement date has been filed for any operating unit at Whittier LFG Power Plant #1. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by landfill gas.

Related pages

California energyAll facilities in the state→Silicon Valley Clean Water2.2 MW operating capacity→ Westmont 400B2.2 MW operating capacity→ Anaheim Solar Energy Plant2.1 MW operating capacity→ County of San Diego COC Hybrid2.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming