AMERICAN ENERGY ATLAS
Industrial + power·Florida

Wheelabrator South Broward, Inc - Resource Recovery Facility

FT. Lauderdale, Broward County, Florida · FPL · operated by Wheelabrator Environmental Systems · owned by Wheelabrator Technologies Holdings Inc

2023 · headline year
Fuel spend$672,7672023 · estimate
Capacity in service66.0MW1 unit · waste
Net generation448GWh2023 · reported
CO₂ emitted289,415t2023 · reported to EPA · 1,256th highest of 6,030 in the US
Rank in Florida#203of 310 · by capacity · #3,130 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor77%2023

Location

Broward County · FPL · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 8.58 TBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 66.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN166.0Municipal solid wasteMunicipal Solid Waste1991Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Wheelabrator Environmental Systems
Entity type
Commercial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1004531
Balancing authority
FPL
NERC region
SERC
EIA plant ID
50887

Common questions

How big is Wheelabrator South Broward, Inc - Resource Recovery Facility?
66.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Wheelabrator Technologies Holdings Inc (100%) and operated by Wheelabrator Environmental Systems, filed as commercial.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991.
When is it due to retire?
No retirement date has been filed for any operating unit at Wheelabrator South Broward, Inc - Resource Recovery Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much does it spend on fuel?
An estimated $672,767 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
289,415 t in 2023, reported to the EPA — the 1,256th highest of 6,030 US facilities that reported. Up from 287,797 t in 2011.

Related pages

Florida energyAll facilities in the state→Tom G.Smith Power Plant70.2 MW operating capacity→ Juniper Solar (FL)70.0 MW operating capacity→ Lake Placid Solar Power Plant62.3 MW operating capacity→ Palm Beach Renewable Energy Facility 162.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming