AMERICAN ENERGY ATLAS
Power·Connecticut

Wheelabrator Lisbon

New London County, Connecticut · ISO-NE · operated by Wheelabrator Environmental Systems

2023 · headline year
Capacity in service14.6MW1 unit · waste
Net generation102GWh2023 · reported
Rank in Connecticut#42of 168 · by capacity · #4,975 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor80%2023

Location

New London County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 2 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 14.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN114.6Municipal solid wasteMunicipal Solid Waste1995Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Wheelabrator Environmental Systems
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
54758

Common questions

How big is Wheelabrator Lisbon?
14.6 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Wheelabrator Environmental Systems, filed as commercial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1995.
When is it due to retire?
No retirement date has been filed for any operating unit at Wheelabrator Lisbon. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.

Related pages

Connecticut energyAll facilities in the state→Wallingford Solar16.1 MW operating capacity→ North Stonington Solar Center, LLC15.0 MW operating capacity→ Derby Fuel Cell14.0 MW operating capacity→ SR North Stonington12.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming