San Luis Obispo County, California · CAISO · operated by Premium Energy Holdings
Capacity shown is planned or not in service
A planned 600 MW hydroelectric pumped storage project, filed to come online in 2027.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit WH001 | 200.0 | Water | Hydroelectric Pumped Storage | 2027 | Proposed |
| Unit WH002 | 200.0 | Water | Hydroelectric Pumped Storage | 2027 | Proposed |
| Unit WH003 | 200.0 | Water | Hydroelectric Pumped Storage | 2027 | Proposed |
All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit WH001 | new unit | 2027 | 200 MW |
| Unit WH002 | new unit | 2027 | 200 MW |
| Unit WH003 | new unit | 2027 | 200 MW |