Longview, Cowlitz County, Washington · BPAT · operated by Longview Fibre Co · owned by Westrock Co
2023 · headline year
Fuel spend$34.5M2023 · estimate
Capacity in service45.0MW2 units · biomass
Net generation171GWh2023 · reported
CO₂ emitted182,361t2023 · reported to EPA · 1,624th highest of 6,030 in the US
Rank in Washington#72of 128 · by capacity · #3,649 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor43%2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
80% Black liquor · 12.3 TBtu · reported20% Natural gas · 3.07 TBtu · reported · $34.5M est.
Black liquor supplies 80% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
7 of 7 shown · 45.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 7
25.0
Black liquor
Wood/Wood Waste Biomass
1966
Operating
Unit 6
20.0
Black liquor
Wood/Wood Waste Biomass
1958
Operating
Unit 8
68.0
Natural Gas
Natural Gas Fired Combustion Turbine
1995
Retired 2002
Unit 4
10.0
Black liquor
Wood/Wood Waste Biomass
1949
Retired 2018
Unit 5
6.0
Black liquor
Wood/Wood Waste Biomass
1950
Retired 2007
Unit 3
3.5
Black liquor
Wood/Wood Waste Biomass
1941
Retired 2007
Unit 2
2.5
Black liquor
Wood/Wood Waste Biomass
1936
Retired 2007
All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.
45.0 MW across 2 generating units in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Westrock Co (100%) and operated by Longview Fibre Co, filed as industrial.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1962. The oldest operating unit is Unit 6 (1958); the newest is Unit 7 (1966).
When is it due to retire?
No retirement date has been filed for any operating unit at Westrock Longview LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor and natural gas.
How much does it spend on fuel?
An estimated $34.5M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
182,361 t in 2023, reported to the EPA — the 1,624th highest of 6,030 US facilities that reported. Down from 188,172 t in 2011.