WestRock CP, LLC--Hopewell Mill (Formerly RockTenn)

Hopewell, Hopewell City, Virginia · PJM · operated by RockTenn-Hopewell · owned by Westrock Co

2023 · headline year
Capacity in service47.6MW1 unit · biomass
Net generation294GWh2023 · reported
CO₂ emitted139,394t2023 · reported to EPA · 1,929th highest of 6,030 in the US
Rank in Virginia#79of 230 · by capacity · #3,591 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor71%2023

Location

Hopewell City · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

79% Other fuels · 7.13 TBtu · reported20% Natural gas · 1.83 TBtu · reported1% Coal · 0.0654 TBtu · reported

Other fuels supplies 79% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 47.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN147.6Black liquorWood/Wood Waste Biomass1980Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Westrock Co · 100%
Operating utility
RockTenn-Hopewell
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper
EPA facility ID
1008708
Balancing authority
PJM
NERC region
SERC
EIA plant ID
50813

Common questions

How big is WestRock CP, LLC--Hopewell Mill (Formerly RockTenn)?
47.6 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Westrock Co (100%) and operated by RockTenn-Hopewell, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1980.
When is it due to retire?
No retirement date has been filed for any operating unit at WestRock CP, LLC--Hopewell Mill (Formerly RockTenn). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels, natural gas and coal.
How much CO₂ does it emit?
139,394 t in 2023, reported to the EPA — the 1,929th highest of 6,030 US facilities that reported. Down from 259,049 t in 2011.

Related pages

Virginia energyAll facilities in the state→Bluestone Solar49.9 MW operating capacity→ Halifax County Biomass49.9 MW operating capacity→ Sycamore Solar42.0 MW operating capacity→ Leesville40.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming