Hodge, Jackson Parish, Louisiana · MISO · operated by Westrock (LA) · owned by Westrock Co
2023 · headline year
Fuel spend$26.5M2023 · estimate
Capacity in service66.4MW3 units · biomass
Net generation412GWh2023 · reported
CO₂ emitted372,721t2023 · reported to EPA · 1,114th highest of 6,030 in the US
Rank in Louisiana#50of 86 · by capacity · #3,127 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor71%2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
63% Black liquor · 11.7 TBtu · reported37% Natural gas · 6.93 TBtu · reported · $26.5M est.
Black liquor supplies 63% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 66.4 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit NO 8
27.5
Black liquor
Wood/Wood Waste Biomass
1972
Operating
Unit NO 9
23.3
Black liquor
Wood/Wood Waste Biomass
1972
Operating
Unit NO 7
15.6
Black liquor
Wood/Wood Waste Biomass
1957
Operating
Unit NO 6
5.0
Black liquor
Wood/Wood Waste Biomass
1952
Retired 2015
Unit NO 4
3.0
Black liquor
Wood/Wood Waste Biomass
1938
Retired 2006
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
66.4 MW across 3 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Westrock Co (100%) and operated by Westrock (LA), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1968. The oldest operating unit is Unit NO 7 (1957); the newest are Unit NO 8 and Unit NO 9 (1972).
When is it due to retire?
No retirement date has been filed for any operating unit at Westrock CP, LLC - Hodge Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor and natural gas.
How much does it spend on fuel?
An estimated $26.5M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
372,721 t in 2023, reported to the EPA — the 1,114th highest of 6,030 US facilities that reported. Up from 286,129 t in 2011.