AMERICAN ENERGY ATLAS
Industrial + power·Colorado

Western Sugar Coop

Fort Morgan, Morgan County, Colorado · PSCO · operated by Western Sugar Cooperative · owned by The Western Sugar Cooperative

2023 · headline year
Fuel spend$8.72M2023 · estimate
Capacity in service3.0MW1 unit · gas
Net generation6.77GWh2023 · reported
CO₂ emitted68,404t2023 · reported to EPA · 3,068th highest of 6,030 in the US
Rank in Colorado#178 (tied)of 303 · by capacity · #8,746 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor26%2023

Location

Morgan County · PSCO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 974,975 MMBtu · reported · $8.72M est.

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 3.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ATB-23.0Natural GasNatural Gas Steam Turbine1947Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
The Western Sugar Cooperative · 100%
Operating utility
Western Sugar Cooperative
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Minerals
EPA facility ID
1001823
Balancing authority
PSCO
NERC region
WECC
Gas pipeline
Colorado Interstate Gas Company LLC
EIA plant ID
58081

Common questions

How big is Western Sugar Coop?
3.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by The Western Sugar Cooperative (100%) and operated by Western Sugar Cooperative, filed as industrial.
Which grid does it sell into?
PSCO (Public Service Company of Colorado) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1947.
When is it due to retire?
No retirement date has been filed for any operating unit at Western Sugar Coop. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $8.72M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
68,404 t in 2023, reported to the EPA — the 3,068th highest of 6,030 US facilities that reported. Down from 112,252 t in 2011.

Related pages

Colorado energyAll facilities in the state→Front Range Project3.2 MW operating capacity→ Foothills Hydro Plant3.1 MW operating capacity→ Boulder City Betasso Hydro Plant3.0 MW operating capacity→ Imboden Solar Garden3.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming