West Campus Steam Plant

Centre County, Pennsylvania · PJM · operated by Penn State University

2023 · headline year
Fuel spend$11.3M2023 · estimate
Capacity in service14.0MW4 units · gas
Net generation45.2GWh2023 · reported
Rank in Pennsylvania#157 (tied)of 256 · by capacity · #5,004 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor37%2023

Location

Centre County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

99% Natural gas · 979,373 MMBtu · reported · $11.1M est.1% Oil & petroleum · 8,894 MMBtu · reported · $207,942 est.

Natural gas supplies 99% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2012–2023

00.511.5201220182023
Reported (through 2023)

Generating units

6 of 6 shown · 14.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CT26.1Natural GasNatural Gas Fired Combustion Turbine2021Operating
Unit WC 42.9Natural GasNatural Gas Steam Turbine2017Operating
Unit WC62.8Natural GasNatural Gas Steam Turbine2021Operating
Unit WC 52.2Natural GasNatural Gas Steam Turbine2017Operating
Unit WC 33.5Bituminous coalConventional Steam Coal1949Retired 2015
Unit WC 22.5Bituminous coalConventional Steam Coal1938Retired 2015

All 6 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Penn State University
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
Gas pipeline
Columbia Gas Transmission Corp
EIA plant ID
58194

Common questions

How big is West Campus Steam Plant?
14.0 MW across 4 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Penn State University, filed as commercial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. The oldest operating units are Unit WC 4 and Unit WC 5 (2017); the newest are Unit CT2 and Unit WC6 (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at West Campus Steam Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $11.3M in 2023 — natural gas $11.1M and oil & petroleum $207,942. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Pennsylvania energyAll facilities in the state→Gans Solar14.0 MW operating capacity→ Pechin Solar14.0 MW operating capacity→ Spring Lane13.8 MW operating capacity→ Allegheny Hydro No 813.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming