Madison, Dane County, Wisconsin · MISO · operated by Madison Gas & Electric Co · owned by Mge Energy Inc
2023 · headline year
Fuel spend$15.2M2023 · estimate
Capacity in service169MW3 units · gas
Net generation353GWh2023 · reported
CO₂ emitted211,764t2023 · reported to EPA · 1,478th highest of 6,030 in the US
Rank in Wisconsin#26of 258 · by capacity · #1,692 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor24%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 3.97 TBtu · reported · $15.2M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
3 of 3 shown · 169 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit STG1
61.3
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit 1
54.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
Unit CT2
54.0
Natural Gas
Natural Gas Fired Combined Cycle
2005
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; stack height; ownership stakes where a unit is jointly held.
Madison Gas & Electric Co 75% of 1 unit University of Wisconsin 25% of 1 unit
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000249
Balancing authority
MISO
NERC region
MRO
EIA plant ID
7991
Common questions
How big is West Campus Cogeneration Facility?
169 MW across 3 generating units in service.
Who owns and operates it?
Owned by Mge Energy Inc and operated by Madison Gas & Electric Co, filed as investor-owned utility. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. Every operating unit came online in 2005.
When is it due to retire?
No retirement date has been filed for any operating unit at West Campus Cogeneration Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $15.2M in 2023 — natural gas $15.2M and oil & petroleum $1,075. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
211,764 t in 2023, reported to the EPA — the 1,478th highest of 6,030 US facilities that reported. Up from 97,808 t in 2011.