AMERICAN ENERGY ATLAS
Power·California

Waste Mangement Redwood LFGTE

Marin County, California · CAISO · operated by WM Renewable Energy LLC

2023 · headline year
Capacity in service4.0MW2 units · biomass
Net generation5.92GWh2023 · reported
Rank in California#977 (tied)of 1,713 · by capacity · #8,041 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor17%2023

Location

Marin County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 68,325 MMBtu · reported

Reported fuel consumption, MMBtu · 2017–23

0200,000400,000600,000201720202023
Reported (through 2023)

Generating units

2 of 2 shown · 4.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit RED12.0Landfill gasLandfill Gas2017Operating
Unit RED22.0Landfill gasLandfill Gas2017Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
59299

Common questions

How big is Waste Mangement Redwood LFGTE?
4.0 MW across 2 generating units in service.
Who owns and operates it?
Operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. Every operating unit came online in 2017.
When is it due to retire?
No retirement date has been filed for any operating unit at Waste Mangement Redwood LFGTE. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

California energyAll facilities in the state→Rutan4.0 MW operating capacity→ UC Riverside Lots 30 & 324.0 MW operating capacity→ Amazon PSP13.8 MW operating capacity→ Ameresco Keller Canyon3.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming