Front Royal, Warren County, Virginia · PJM · operated by Virginia Electric & Power Co · owned by Dominion Energy Inc
2023 · headline year
The 2nd-largest reported CO₂ emitter among facilities in Virginia — 3.14 Mt in 2023, 100% natural gas by fuel energy in 2023, first unit online in 2014.
Reported fuel cost$195M2023 · reported deliveries
Capacity in service1,472MW4 units · gas
Net generation8.47TWh2023 · reported
CO₂ emitted3.14Mt2023 · reported to EPA · 152nd highest of 6,030 in the US
Rank in Virginia#5 (tied)of 230 · by capacity · #149 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor66%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 58.1 TBtu · reported
CO₂ emitted, Mt · 2014–23
Reported (through 2023)
Generating units
4 of 4 shown · 1,472 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit ST01
579.7
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
Unit CT01
297.5
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
Unit CT02
297.5
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
Unit CT03
297.5
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 107 deliveries recorded 2015–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Dominion Energy Inc (100%) and operated by Virginia Electric & Power Co, filed as investor-owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2014. Every operating unit came online in 2014.
When is it due to retire?
No retirement date has been filed for any operating unit at Warren County Power Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $195M in 2023.
How much CO₂ does it emit?
3.14 Mt in 2023, reported to the EPA — the 152nd highest of 6,030 US facilities that reported. Up from 79,068 t in 2014.