AMERICAN ENERGY ATLAS
Power·Michigan

Warner Lambert

Washtenaw County, Michigan · MISO · operated by University of Michigan NCampus Research

2023 · headline year
Fuel spend$2.79M2023 · estimate
Capacity in service3.0MW1 unit · gas · 5 more on standby or out of service
Net generation19.3GWh2023 · reported
Rank in Michigan#202 (tied)of 258 · by capacity · #8,746 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Washtenaw County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 341,627 MMBtu · reported · $2.76M est.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 3.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 51643.0Natural GasNatural Gas Fired Combustion Turbine1989Operating
Unit 085-12.3Distillate oilPetroleum Liquids2005Standby
Unit 085-22.3Distillate oilPetroleum Liquids2005Standby
Unit 800-12.3Distillate oilPetroleum Liquids2007Standby
Unit 05501.5Distillate oilPetroleum Liquids2002Standby
Unit 016E1.0Distillate oilPetroleum Liquids1992Standby

All 6 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
University of Michigan NCampus Research
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
Gas pipeline
DTE Gas Company
EIA plant ID
54604

Common questions

How big is Warner Lambert?
3.0 MW across 1 generating unit in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by University of Michigan NCampus Research, filed as commercial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at Warner Lambert. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $2.79M in 2023 — natural gas $2.76M and oil & petroleum $26,369. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Michigan energyAll facilities in the state→Zeeland Farm Services3.2 MW operating capacity→ Grand Valley Solar Gardens3.0 MW operating capacity→ Hemlock Falls2.8 MW operating capacity→ Allegan Dam2.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming