AMERICAN ENERGY ATLAS
Power·Georgia

Walton County Power, LLC

Monroe, Walton County, Georgia · SOCO · operated by Oglethorpe Power Corporation · owned by Walton County Power LLC

2023 · headline year
Fuel spend$8.16M2023 · estimate
Capacity in service494MW3 units · gas
Net generation259GWh2023 · reported
CO₂ emitted139,397t2023 · reported to EPA · 1,928th highest of 6,030 in the US
Rank in Georgia#25of 247 · by capacity · #716 of 13,147 US
Reported suppliers12023 · 18 deliveries
Capacity factor6%2023

Location

Walton County · SOCO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 2.68 TBtu · reported · $8.16M est.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 494 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 101G164.7Natural GasNatural Gas Fired Combustion Turbine2001Operating
Unit 102G164.7Natural GasNatural Gas Fired Combustion Turbine2001Operating
Unit 103G164.7Natural GasNatural Gas Fired Combustion Turbine2001Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered MMBtuTonsMine of originTransport
Rainbow Energy Marketing CorpNatural gas106,863n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 224 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Walton County Power LLC · 100%
Operating utility
Oglethorpe Power Corporation
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001328
Balancing authority
SOCO
NERC region
SERC
Gas pipeline
Transcontinental Gas Pipeline
EIA plant ID
55128

Common questions

How big is Walton County Power, LLC?
494 MW across 3 generating units in service.
Who owns and operates it?
Owned by Walton County Power LLC (100%) and operated by Oglethorpe Power Corporation, filed as cooperative.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2001. Every operating unit came online in 2001.
When is it due to retire?
No retirement date has been filed for any operating unit at Walton County Power, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $8.16M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
139,397 t in 2023, reported to the EPA — the 1,928th highest of 6,030 US facilities that reported. Down from 206,648 t in 2011.

Related pages

Georgia energyAll facilities in the state→Carters500 MW operating capacity→ Hawk Road Energy Facility495 MW operating capacity→ Richard B Russell464 MW operating capacity→ Doyle Energy Facility409 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming