AMERICAN ENERGY ATLAS
Power·California

Walnut Power Plant

Turlock, Stanislaus County, California · TIDC · operated by Turlock Irrigation District

last reported to the EPA in 2015

2023 · headline year
Capacity in service49.8MW2 units · gas
CO₂ emittedNot reported2023 · last reported 2015
Rank in California#392 (tied)of 1,713 · by capacity · #3,538 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Stanislaus County · TIDC · WECC

What it burns

2023 · reported

Share of reported fuel consumption

71% Natural gas · 6,019 MMBtu · reported29% Oil & petroleum · 2,503 MMBtu · reported

Natural gas supplies 71% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–15

05001,0001,500201120132015
Reported (through 2015)

Generating units

2 of 2 shown · 49.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 124.9Natural GasNatural Gas Fired Combustion Turbine1986Operating
Unit 224.9Natural GasNatural Gas Fired Combustion Turbine1986Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Turlock Irrigation District
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1003831
Balancing authority
TIDC
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
4256

Common questions

How big is Walnut Power Plant?
49.8 MW across 2 generating units in service.
Who owns and operates it?
Operated by Turlock Irrigation District, filed as political subdivision.
Which grid does it sell into?
TIDC (Turlock Irrigation District) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1986. Every operating unit came online in 1986.
When is it due to retire?
No retirement date has been filed for any operating unit at Walnut Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.

Related pages

California energyAll facilities in the state→Mira Loma Generating Station49.8 MW operating capacity→ Rockwood49.8 MW operating capacity→ Chowchilla II49.6 MW operating capacity→ Greenleaf Energy Unit 2 LLC49.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming