AMERICAN ENERGY ATLAS
Power·California

Walnut Energy Center

Turlock, Stanislaus County, California · TIDC · operated by Turlock Irrigation District · owned by Turlock Irrigation District Employees Assoc

2023 · headline year
Reported fuel cost$108M2023 · reported deliveries
Capacity in service301MW3 units · gas
Net generation1.57TWh2023 · reported
CO₂ emitted707,349t2023 · reported to EPA · 777th highest of 6,030 in the US
Rank in California#67of 1,713 · by capacity · #991 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor59%2023

Location

Stanislaus County · TIDC · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 12.1 TBtu · reported

CO₂ emitted, t · 2011–2023

0250,000500,000750,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 301 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 3110.8Natural GasNatural Gas Fired Combined Cycle2006Operating
Unit 194.9Natural GasNatural Gas Fired Combined Cycle2006Operating
Unit 294.9Natural GasNatural Gas Fired Combined Cycle2006Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Castleton Commodities International LLCNatural gas12.1n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 152 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Turlock Irrigation District
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000464
Balancing authority
TIDC
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
56078

Common questions

How big is Walnut Energy Center?
301 MW across 3 generating units in service.
Who owns and operates it?
Owned by Turlock Irrigation District Employees Assoc (100%) and operated by Turlock Irrigation District, filed as political subdivision.
Which grid does it sell into?
TIDC (Turlock Irrigation District) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2006. Every operating unit came online in 2006.
When is it due to retire?
No retirement date has been filed for any operating unit at Walnut Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $108M in 2023.
How much CO₂ does it emit?
707,349 t in 2023, reported to the EPA — the 777th highest of 6,030 US facilities that reported. Up from 495,930 t in 2011.

Related pages

California energyAll facilities in the state→Daggett 2313 MW operating capacity→ Los Esteros Critical Energy Fac306 MW operating capacity→ Solano Wind300 MW operating capacity→ SYCAMORE COGENERATION Facility300 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming