Pinal County, Arizona · AZPS · operated by Tesla Inc.
Retired — its last generating unit went out of service in 2023, ending 2.0 MW of capacity.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 1 | 1.0 | Solar | Solar Photovoltaic | 2011 | Retired 2023 |
| Unit 2 | 1.0 | Solar | Solar Photovoltaic | 2011 | Retired 2023 |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →