Milam County, Texas · ERCOT · operated by EDF Renewable Asset Holdings, Inc.
Capacity shown is planned or not in service
A planned 369 MW solar photovoltaic project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit SDTWO | 369.0 | Solar | Solar Photovoltaic | 2026 | Proposed |
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit SDTWO | new unit | 2026 | 369 MW |