AMERICAN ENERGY ATLAS
Industrial + power·Wisconsin

W M W I - Timberline Trail RDF

Weyerhaeuser, Rusk County, Wisconsin · MISO · operated by WM Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Fuel spend$146,2882023 · estimate
Capacity in service3.2MW4 units · biomass
Net generation16.9GWh2023 · reported
CO₂ emitted17,064t2023 · reported to EPA · 5,537th highest of 6,030 in the US
Rank in Wisconsin#162of 258 · by capacity · #8,612 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor60%2023

Location

Rusk County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 213,117 MMBtu · reported

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 3.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN20.8Landfill gasLandfill Gas2006Operating
Unit GEN30.8Landfill gasLandfill Gas2006Operating
Unit GEN40.8Landfill gasLandfill Gas2006Operating
Unit GEN50.8Landfill gasLandfill Gas2007Operating
Unit GEN10.8Landfill gasLandfill Gas2006Retired 2014
Unit GEN60.8Landfill gasLandfill Gas2007Retired 2011
Unit GEN70.8Landfill gasLandfill Gas2007Retired 2011

All 7 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007705
Balancing authority
MISO
NERC region
MRO
EIA plant ID
56525

Common questions

How big is W M W I - Timberline Trail RDF?
3.2 MW across 4 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2006. The oldest operating units are Unit GEN2, Unit GEN3 and Unit GEN4 (2006); the newest is Unit GEN5 (2007).
When is it due to retire?
No retirement date has been filed for any operating unit at W M W I - Timberline Trail RDF. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much does it spend on fuel?
An estimated $146,288 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
17,064 t in 2023, reported to the EPA — the 5,537th highest of 6,030 US facilities that reported. Down from 54,191 t in 2011.

Related pages

Wisconsin energyAll facilities in the state→Brule3.3 MW operating capacity→ Little Chute3.3 MW operating capacity→ Ameresco Janesville3.0 MW operating capacity→ Barron Solar Array3.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming