Lumberton, Robeson County, North Carolina · CPLE · operated by Duke Energy Progress - (NC)
last reported to the EPA in 2016
2023 · headline year
Capacity in service163MW4 units · oil
Net generation104MWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2016
Rank in North Carolina#29of 908 · by capacity · #1,725 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor0%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Oil & petroleum · 19,243 MMBtu · reported
CO₂ emitted, t · 2011–16
Reported (through 2016)
Generating units
7 of 7 shown · 163 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GT3
41.8
Distillate oil
Petroleum Liquids
1971
Operating
Unit GT4
41.8
Distillate oil
Petroleum Liquids
1971
Operating
Unit GT1
39.7
Distillate oil
Petroleum Liquids
1970
Operating
Unit GT2
39.7
Distillate oil
Petroleum Liquids
1970
Operating
Unit 3
73.5
Bituminous coal
Conventional Steam Coal
1952
Retired 2011
Unit 1
46.0
Bituminous coal
Conventional Steam Coal
1949
Retired 2011
Unit 2
46.0
Bituminous coal
Conventional Steam Coal
1950
Retired 2011
All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
163 MW across 4 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Duke Energy Progress - (NC), filed as investor-owned utility.
Which grid does it sell into?
CPLE (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1971. The oldest operating units are Unit GT1 and Unit GT2 (1970); the newest are Unit GT3 and Unit GT4 (1971).
When is it due to retire?
No retirement date has been filed for any operating unit at W H Weatherspoon Steam Electric Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?