AMERICAN ENERGY ATLAS
Power·North Carolina

W H Weatherspoon Steam Electric Plant

Lumberton, Robeson County, North Carolina · CPLE · operated by Duke Energy Progress - (NC)

last reported to the EPA in 2016

2023 · headline year
Capacity in service163MW4 units · oil
Net generation104MWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2016
Rank in North Carolina#29of 908 · by capacity · #1,725 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor0%2023

Location

Robeson County · CPLE · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 19,243 MMBtu · reported

CO₂ emitted, t · 2011–16

0100,000200,000300,000201120142016
Reported (through 2016)

Generating units

7 of 7 shown · 163 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GT341.8Distillate oilPetroleum Liquids1971Operating
Unit GT441.8Distillate oilPetroleum Liquids1971Operating
Unit GT139.7Distillate oilPetroleum Liquids1970Operating
Unit GT239.7Distillate oilPetroleum Liquids1970Operating
Unit 373.5Bituminous coalConventional Steam Coal1952Retired 2011
Unit 146.0Bituminous coalConventional Steam Coal1949Retired 2011
Unit 246.0Bituminous coalConventional Steam Coal1950Retired 2011

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 9 deliveries are on record for 2011–2012.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Duke Energy Progress - (NC)
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000829
Balancing authority
CPLE
NERC region
SERC
EIA plant ID
2716

Common questions

How big is W H Weatherspoon Steam Electric Plant?
163 MW across 4 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Duke Energy Progress - (NC), filed as investor-owned utility.
Which grid does it sell into?
CPLE (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1971. The oldest operating units are Unit GT1 and Unit GT2 (1970); the newest are Unit GT3 and Unit GT4 (1971).
When is it due to retire?
No retirement date has been filed for any operating unit at W H Weatherspoon Steam Electric Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.

Related pages

North Carolina energyAll facilities in the state→Gaston178 MW operating capacity→ Hiwassee Dam166 MW operating capacity→ Cheoah140 MW operating capacity→ Albemarle Beach Solar130 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming