AMERICAN ENERGY ATLAS
Power·Vermont

Vergennes 9

Addison County, Vermont · ISO-NE · operated by Green Mountain Power Corp

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service2.4MW3 units · hydro
Rank in Vermont#57 (tied)of 118 · by capacity · #9,489 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Addison County · ISO-NE · NPCC

Reported fuel consumption, MMBtu · 2011–2021

02,0004,0006,000201120162021
Reported (through 2021)

Generating units

5 of 5 shown · 2.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 41.0WaterConventional Hydroelectric1943Operating
Unit 10.7WaterConventional Hydroelectric1912Operating
Unit 20.7WaterConventional Hydroelectric1912Operating
Unit 52.0Distillate oilPetroleum Liquids1963Retired 2021
Unit 62.0Distillate oilPetroleum Liquids1964Retired 2021

All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Green Mountain Power Corp
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
6519

Common questions

How big is Vergennes 9?
2.4 MW across 3 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Green Mountain Power Corp, filed as investor-owned utility.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1925. The oldest operating units are Unit 1 and Unit 2 (1912); the newest is Unit 4 (1943).
When is it due to retire?
No retirement date has been filed for any operating unit at Vergennes 9. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by distillate oil.
How much does it spend on fuel?
Nothing in 2023 — its units in service (conventional hydroelectric) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Vermont energyAll facilities in the state→Weybridge3.0 MW operating capacity→ Lower Middlebury2.4 MW operating capacity→ Cold River Road Solar2.3 MW operating capacity→ Sheldon Solar2.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming