AMERICAN ENERGY ATLAS
Industrial + power·Kentucky

Veolia Es Morehead Landfill

Morehead, Rowan County, Kentucky · PJM · operated by North American Biofuels, LLC · owned by Waste Management Inc

2023 · headline year
Fuel spend$120,6412023 · estimate
Capacity in service1.4MW1 unit · biomass
Net generation3.87GWh2023 · reported
CO₂ emitted61,696t2023 · reported to EPA · 3,291st highest of 6,030 in the US
Rank in Kentucky#55of 58 · by capacity · #11,571 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor32%2023

Location

Rowan County · PJM · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 63,434 MMBtu · reported

CO₂ emitted, t · 2011–2023

025,00050,00075,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 1.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit M35161.4Landfill gasLandfill Gas2019Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
North American Biofuels, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1001642
Balancing authority
PJM
NERC region
SERC
EIA plant ID
62641

Common questions

How big is Veolia Es Morehead Landfill?
1.4 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by North American Biofuels, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2019.
When is it due to retire?
No retirement date has been filed for any operating unit at Veolia Es Morehead Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned landfill gas.
How much does it spend on fuel?
An estimated $120,641 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
61,696 t in 2023, reported to the EPA — the 3,291st highest of 6,030 US facilities that reported. Up from 9,417 t in 2011.

Related pages

Kentucky energyAll facilities in the state→Walton 2 Solar Facility2.0 MW operating capacity→ Blue Ridge Generating1.6 MW operating capacity→ RA Jones Roof Mounted Solar System1.3 MW operating capacity→ L'Oreal Solar - Florence1.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming