V H Braunig

Elmendorf, Bexar County, Texas · ERCOT · operated by City of San Antonio - (TX) · owned by CPS Energy

2023 · headline year
Reported fuel cost$134M2023 · reported deliveries
Capacity in service1,713MW10 units · gas
Net generation4.53TWh2023 · reported
CO₂ emitted2.08Mt2023 · reported to EPA · 292nd highest of 6,030 in the US
Rank in Texas#10of 941 · by capacity · #116 of 13,147 US
Reported suppliers12023 · 24 deliveries
Capacity factor30%2023

Location

Bexar County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 38.6 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

10 of 10 shown · 1,713 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 3 · plant 3612417.0Natural GasNatural Gas Steam Turbine1970Operating
Unit 2 · plant 3612252.0Natural GasNatural Gas Steam Turbine1968Operating
Unit 1 · plant 3612225.0Natural GasNatural Gas Steam Turbine1966Operating
Unit 3 · plant 7512200.0Natural GasNatural Gas Fired Combined Cycle2000Operating
Unit 1 · plant 7512187.5Natural GasNatural Gas Fired Combined Cycle2000Operating
Unit 2 · plant 7512187.5Natural GasNatural Gas Fired Combined Cycle2000Operating
Unit 561.0Natural GasNatural Gas Fired Combustion Turbine2010Operating
Unit 661.0Natural GasNatural Gas Fired Combustion Turbine2010Operating
Unit 761.0Natural GasNatural Gas Fired Combustion Turbine2010Operating
Unit 861.0Natural GasNatural Gas Fired Combustion Turbine2010Operating

All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit 1 · plant 7512uprate2025-0120.0 MW
Unit 2 · plant 7512uprate2025-0120.0 MW
Unit 3 · plant 3612retirement2027-03417 MW

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
CPSNatural gas38.6n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 312 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
CPS Energy · 100%
Operating utility
City of San Antonio - (TX)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001104
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
Gas pipeline
Enterprise Texas Pipeline
EIA plant IDs
3612 · 7512

Common questions

How big is V H Braunig?
1,713 MW across 10 generating units in service. The total spans EIA plants 3612 and 7512, filed under one facility.
Who owns and operates it?
Owned by CPS Energy (100%) and operated by City of San Antonio - (TX), filed as municipally owned utility.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 1985. The oldest operating unit is Unit 1 · plant 3612 (1966); the newest are Unit 5, Unit 6, Unit 7 and Unit 8 (2010).
When is it due to retire?
Planned retirement dates are filed for 1 of 10 operating units: Unit 3 · plant 3612 (2027).
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $134M in 2023.
How much CO₂ does it emit?
2.08 Mt in 2023, reported to the EPA — the 292nd highest of 6,030 US facilities that reported. Up from 1.3 Mt in 2011.

Related pages

Texas energyAll facilities in the state→Oak Grove1,795 MW operating capacity→ Midlothian Energy1,734 MW operating capacity→ Sam Seymour1,690 MW operating capacity→ Temple Power Station1,606 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming