AMERICAN ENERGY ATLAS
Power·Minnesota

USS Cougar Solar LLC CSG

Redwood County, Minnesota · MISO · operated by Standard Solar

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service1.0MW1 unit · solar
Rank in Minnesota#420 (tied)of 767 · by capacity · #12,215 (tied) of 13,147 US

Location

Redwood County · MISO · MRO

Generating units

1 of 1 shown · 1.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit COUGR1.0SolarSolar Photovoltaic2020Operating

1 unit shown. Behind it, AEA holds the full engineering record: panel technology, tracking and DC capacity; ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
Standard Solar
Jointly held units
Standard Solar 90% of 1 unit
US Solar 10% of 1 unit
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
MRO
EIA plant ID
63158

Common questions

How big is USS Cougar Solar LLC CSG?
1.0 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Standard Solar, filed as independent power producer. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at USS Cougar Solar LLC CSG. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (1.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Minnesota energyAll facilities in the state→USS Christoffer Solar LLC CSG1.0 MW operating capacity→ USS Cosmo Solar LLC (CSG)1.0 MW operating capacity→ USS Danube Solar LLC1.0 MW operating capacity→ USS Dressen Family Solar LLC1.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming