US Marine Corps MCAGCC Twentynine Palms Environmental Affairs

Twentynine Palms, San Bernardino County, California · CAISO · operated by DOD USMC Marine Air Ground Combat · owned by US Government

2023 · headline year
Fuel spend$5.98M2023 · estimate
Capacity in service16.4MW3 units · gas
Net generation41.3GWh2023 · reported
CO₂ emitted38,143t2023 · reported to EPA · 4,240th highest of 6,030 in the US
Rank in California#677 (tied)of 1,713 · by capacity · #4,834 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor29%2023

Location

San Bernardino County · CAISO · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 542,477 MMBtu · reported · $5.98M est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 16.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CG17.2Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit CG1004.6Natural GasNatural Gas Fired Combustion Turbine2014Operating
Unit CG2004.6Natural GasNatural Gas Fired Combustion Turbine2014Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
US Government
Operating utility
DOD USMC Marine Air Ground Combat
Entity type
Federally Owned Utility
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1002237
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
58914

Common questions

How big is US Marine Corps MCAGCC Twentynine Palms Environmental Affairs?
16.4 MW across 3 generating units in service.
Who owns and operates it?
Owned by US Government and operated by DOD USMC Marine Air Ground Combat, filed as federally owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2009. The oldest operating unit is Unit CG1 (2003); the newest are Unit CG100 and Unit CG200 (2014).
When is it due to retire?
No retirement date has been filed for any operating unit at US Marine Corps MCAGCC Twentynine Palms Environmental Affairs. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $5.98M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
38,143 t in 2023, reported to the EPA — the 4,240th highest of 6,030 US facilities that reported. Up from 34,922 t in 2011.

Related pages

California energyAll facilities in the state→SMUD at Grundman17.0 MW operating capacity→ Redcrest Solar Farm16.6 MW operating capacity→ Wise16.4 MW operating capacity→ Sand Bar Power Plant16.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming