University of California Santa Cruz

Santa Cruz County, California · CAISO · operated by University of California Santa Cruz

2023 · headline year
Fuel spend$5.01M2023 · estimate
Capacity in service7.4MW4 units · gas + solar + storage
Rank in California#807 (tied)of 1,713 · by capacity · #6,088 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Santa Cruz County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 368,449 MMBtu · reported · $5.01M est.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 7.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 0034.4Natural GasNatural Gas Fired Combustion Turbine2015Operating
Unit 2461.8SolarSolar Photovoltaic2021Operating
Unit 180271.0StorageBatteries2022Operating
Unit 0040.2SolarSolar Photovoltaic2013Operating
Unit 0012.6Natural GasNatural Gas Internal Combustion Engine1985Retired 2013
Unit 0020.2Natural GasNatural Gas Internal Combustion Engine1988Retired 2009

All 6 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
University of California Santa Cruz
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
50064

Common questions

How big is University of California Santa Cruz?
7.4 MW across 4 generating units in service — 4.4 MW of natural gas, 2.0 MW of solar and 1.0 MW of storage. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by University of California Santa Cruz, filed as state-owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. The oldest operating unit is Unit 004 (2013); the newest is Unit 18027 (2022).
When is it due to retire?
No retirement date has been filed for any operating unit at University of California Santa Cruz. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $5.01M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Sierra Pacific Sonora7.5 MW operating capacity→ Terra-Gen VG Wind LLC7.4 MW operating capacity→ Usps PV7.4 MW operating capacity→ Bishop Creek 27.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming