AMERICAN ENERGY ATLAS
Industrial + power·Arizona

University of Arizona

Tucson, Pima County, Arizona · TEPC · operated by University of Arizona · owned by Arizona Board of Regents

2023 · headline year
Fuel spend$10.1M2023 · estimate
Capacity in service9.0MW1 unit · gas
Net generation54.1GWh2023 · reported
CO₂ emitted79,182t2023 · reported to EPA · 2,805th highest of 6,030 in the US
Rank in Arizona#119 (tied)of 166 · by capacity · #5,746 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor69%2023

Location

Pima County · TEPC · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 660,259 MMBtu · reported · $10.1M est.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 9.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CT19.0Natural GasNatural Gas Fired Combined Cycle2002Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Arizona Board of Regents · 100%
Operating utility
University of Arizona
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1006446
Balancing authority
TEPC
NERC region
WECC
EIA plant ID
56229

Common questions

How big is University of Arizona?
9.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Arizona Board of Regents (100%) and operated by University of Arizona, filed as state-owned utility.
Which grid does it sell into?
TEPC (Tucson Electric Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002.
When is it due to retire?
No retirement date has been filed for any operating unit at University of Arizona. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $10.1M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
79,182 t in 2023, reported to the EPA — the 2,805th highest of 6,030 US facilities that reported. Down from 80,582 t in 2011.

Related pages

Arizona energyAll facilities in the state→Pima Energy Storage System10.0 MW operating capacity→ Valencia Solar10.0 MW operating capacity→ Black Mountain Solar LLC9.0 MW operating capacity→ Tucson - CAVSARP7.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming