Capacity in service27.4MW3 units · gas
Net generation75.5GWh2023 · reported
Rank in Maryland#31of 210 · by capacity · #4,138 of 13,147 US
Reported suppliersNot reported2023
Capacity factor31%2023

Location

Prince Georges County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.72 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 27.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 111.0Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit 211.0Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit 35.4Natural GasNatural Gas Steam Turbine2003Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times; ownership stakes where a unit is jointly held.

See the engineering record →
UnitEventWhenMW
Unit 1retirement2025-0511.0 MW
Unit 2retirement2025-0511.0 MW
Unit 3retirement2025-055.4 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Trigen-Cinergy Solutions College Park
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
Gas pipeline
Washington Gas Light Company
EIA plant ID
56038

Common questions

How big is UMCP CHP Plant?
27.4 MW across 3 generating units in service.
Who owns and operates it?
Operated by Trigen-Cinergy Solutions College Park, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. Every operating unit came online in 2003.
When is it due to retire?
Planned retirement dates are filed for 3 of 3 operating units: Unit 1 (2025), Unit 2 (2025) and Unit 3 (2025).
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Related pages

Maryland energyAll facilities in the state→US Public Health Service National Institutes of Health28.0 MW operating capacity→ Ripley27.5 MW operating capacity→ Maryland Solar27.0 MW operating capacity→ Fort Detrick Solar PV21.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming