AMERICAN ENERGY ATLAS
Industrial + power·Massachusetts

Umass Physical Plant Building

Amherst, Hampshire County, Massachusetts · ISO-NE · operated by Consolidated Edison Development Inc. · owned by University of Massachusetts

2023 · headline year
Fuel spend$7.48M2023 · estimate
Capacity in service4.0MW1 unit · solar
CO₂ emitted103,468t2023 · reported to EPA · 2,364th highest of 6,030 in the US
Rank in Massachusetts#208 (tied)of 666 · by capacity · #8,041 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Hampshire County · ISO-NE · NPCC

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 4.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit UMASS4.0SolarSolar Photovoltaic2016Operating

1 unit shown. Behind it, AEA holds the full engineering record: panel technology, tracking and DC capacity.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
University of Massachusetts · 100%
Operating utility
Consolidated Edison Development Inc.
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1005136
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
61603

Common questions

How big is Umass Physical Plant Building?
4.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by University of Massachusetts (100%) and operated by Consolidated Edison Development Inc., filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2016.
When is it due to retire?
No retirement date has been filed for any operating unit at Umass Physical Plant Building. An absent date means none is currently filed, not that the plant will run indefinitely.
How much does it spend on fuel?
An estimated $7.48M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
103,468 t in 2023, reported to the EPA — the 2,364th highest of 6,030 US facilities that reported. Down from 107,215 t in 2011.

Related pages

Massachusetts energyAll facilities in the state→UMass PV Lot 224.1 MW operating capacity→ West Groton CHP4.1 MW operating capacity→ 0 Middle4.0 MW operating capacity→ Ava Solar4.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming