AMERICAN ENERGY ATLAS
Power·Connecticut

UCONN Cogen Facility

Tolland County, Connecticut · ISO-NE · operated by University of Connecticut

2023 · headline year
Capacity in service25.7MW4 units · gas
Net generation122GWh2023 · reported
Rank in Connecticut#28of 168 · by capacity · #4,188 of 13,147 US
Reported suppliersNot reported2023
Capacity factor54%2023

Location

Tolland County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

99% Natural gas · 1.44 TBtu · reported1% Oil & petroleum · 0.013 TBtu · reported

Natural gas supplies 99% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2012–2023

0123201220182023
Reported (through 2023)

Generating units

4 of 4 shown · 25.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CGT16.9Natural GasNatural Gas Fired Combined Cycle2006Operating
Unit CGT26.9Natural GasNatural Gas Fired Combined Cycle2006Operating
Unit CGT36.9Natural GasNatural Gas Fired Combined Cycle2006Operating
Unit STG15.0Natural GasNatural Gas Fired Combined Cycle2006Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →
UnitEventWhenMW
Unit CGT2uprate2025-050.5 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
University of Connecticut
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
Gas pipeline
Algonquin Gas Transmission Company
EIA plant ID
58159

Common questions

How big is UCONN Cogen Facility?
25.7 MW across 4 generating units in service.
Who owns and operates it?
Operated by University of Connecticut, filed as state-owned utility.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2006. Every operating unit came online in 2006.
When is it due to retire?
No retirement date has been filed for any operating unit at UCONN Cogen Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.

Related pages

Connecticut energyAll facilities in the state→Stevenson30.5 MW operating capacity→ Pratt & Whitney, East Hartford25.8 MW operating capacity→ Branford21.8 MW operating capacity→ Franklin Drive21.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming