AMERICAN ENERGY ATLAS
Industrial + power·New York

U S Gypsum - Oakfield Plant

Oakfield, Genesee County, New York · NYISO · operated by U S Gypsum Co · owned by Usg Corp

2023 · headline year
Fuel spend$5.45M2023 · estimate
Capacity in service5.8MW1 unit · gas
Net generation15.8GWh2023 · reported
CO₂ emitted28,694t2023 · reported to EPA · 4,848th highest of 6,030 in the US
Rank in New York#266of 1,018 · by capacity · #6,427 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor31%2023

Location

Genesee County · NYISO · NPCC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 249,766 MMBtu · reported · $5.45M est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 5.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN15.8Natural GasNatural Gas Fired Combustion Turbine1986Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Usg Corp · 100%
Operating utility
U S Gypsum Co
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper
EPA facility ID
1002309
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
50203

Common questions

How big is U S Gypsum - Oakfield Plant?
5.8 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Usg Corp (100%) and operated by U S Gypsum Co, filed as industrial.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1986.
When is it due to retire?
No retirement date has been filed for any operating unit at U S Gypsum - Oakfield Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $5.45M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
28,694 t in 2023, reported to the EPA — the 4,848th highest of 6,030 US facilities that reported. Down from 29,743 t in 2011.

Related pages

New York energyAll facilities in the state→Stuyvesant Falls6.0 MW operating capacity→ MM Albany Energy5.9 MW operating capacity→ Black River Hydro Associates5.7 MW operating capacity→ Lyons Falls Hydroelectric5.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming