Trumbull County, Ohio · PJM · operated by Clean Energy Future - Trumbull, LLC.
Capacity shown is planned or not in service
A planned 1,086 MW natural gas fired combined cycle project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit STG | 400.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Proposed |
| Unit GT11 | 343.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Proposed |
| Unit GT12 | 343.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Proposed |
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit GT11 | new unit | 2026 | 343 MW |
| Unit GT12 | new unit | 2026 | 343 MW |
| Unit STG | new unit | 2026 | 400 MW |