Liberty County, Texas · ERCOT · operated by Lightsource Renewable Energy Asset Management, LLC
Capacity shown is planned or not in service
A planned 150 MW solar photovoltaic project, filed to come online in 2028.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit TXTR1 | 150.0 | Solar | Solar Photovoltaic | 2028 | Proposed |
| Unit TXTR2 | 75.0 | Storage | Batteries | not reported | Canceled |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit TXTR1 | new unit | 2028 | 150 MW |