Trinidad, Henderson County, Texas · ERCOT · operated by Luminant Generation Company LLC · owned by Vistra Corp
2023 · headline year
Fuel spend$10M2023 · estimate
Capacity in service243MW3 units · gas + oil
Net generation331GWh2023 · reported
CO₂ emitted228,294t2023 · reported to EPA · 1,436th highest of 6,030 in the US
Rank in Texas#206of 941 · by capacity · #1,230 of 13,147 US
Reported suppliers12023 · 11 deliveries
Capacity factor16%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 3.7 TBtu · reported · $10M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
3 of 3 shown · 243 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 6
239.3
Natural Gas
Natural Gas Steam Turbine
1965
Operating
Unit D1
2.0
Distillate oil
Petroleum Liquids
1966
Operating
Unit D2
2.0
Distillate oil
Petroleum Liquids
1966
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 149 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
243 MW across 3 generating units in service — 239 MW of natural gas and 4.0 MW of oil.
Who owns and operates it?
Owned by Vistra Corp (100%) and operated by Luminant Generation Company LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 1965. The oldest operating unit is Unit 6 (1965); the newest are Unit D1 and Unit D2 (1966).
When is it due to retire?
No retirement date has been filed for any operating unit at Trinidad. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $10M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
228,294 t in 2023, reported to the EPA — the 1,436th highest of 6,030 US facilities that reported. Up from 55,395 t in 2011.