Tres City Power LLC

Victoria, Victoria County, Texas · ERCOT · operated by Tres Power Victoria LLC · owned by Tres Power LLC

2023 · headline year
Fuel spend$1.23M2023 · estimate
Capacity in service100MW2 units · gas
Net generation43.4GWh2023 · reported
CO₂ emitted21,627t2023 · reported to EPA · 5,362nd highest of 6,030 in the US
Rank in Texas#448 (tied)of 941 · by capacity · #2,384 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor5%2023

Location

Victoria County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 455,665 MMBtu · reported · $1.23M est.

CO₂ emitted, t · 2019–23

020,00040,00060,000201920212023
Reported (through 2023)

Generating units

2 of 2 shown · 100 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit VC-150.0Natural GasNatural Gas Fired Combustion Turbine2020Operating
Unit VC-250.0Natural GasNatural Gas Fired Combustion Turbine2020Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Tres Power LLC · 100%
Operating utility
Tres Power Victoria LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1013540
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
Gas pipeline
Kinder Morgan Tejas Pipeline LLC
EIA plant ID
61241

Common questions

How big is Tres City Power LLC?
100 MW across 2 generating units in service.
Who owns and operates it?
Owned by Tres Power LLC (100%) and operated by Tres Power Victoria LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. Every operating unit came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at Tres City Power LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.23M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
21,627 t in 2023, reported to the EPA — the 5,362nd highest of 6,030 US facilities that reported. Up from 913 t in 2019.

Related pages

Texas energyAll facilities in the state→Victoria Port II Power LLC100 MW operating capacity→ Tres Port Power LLC100 MW operating capacity→ Bat Cave100 MW operating capacity→ BPL Crown Solar LLC100 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming