AMERICAN ENERGY ATLAS
Power·Missouri

Trenton South

Grundy County, Missouri · SPP · operated by Trenton Municipal Utilities - (MO)

2023 · headline year
Fuel spend$13,9432023 · estimate
Capacity in service14.0MW7 units · oil
Net generation59MWh2023 · reported
Rank in Missouri#77of 119 · by capacity · #5,004 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Grundy County · SPP · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 632 MMBtu · reported · $13,943 est.

Reported fuel consumption, MMBtu · 2011–2023

05001,0001,500201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 14.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 12.0Distillate oilPetroleum Liquids2000Operating
Unit 22.0Distillate oilPetroleum Liquids2000Operating
Unit 32.0Distillate oilPetroleum Liquids2000Operating
Unit 42.0Distillate oilPetroleum Liquids2000Operating
Unit 52.0Distillate oilPetroleum Liquids2004Operating
Unit 62.0Distillate oilPetroleum Liquids2004Operating
Unit 72.0Distillate oilPetroleum Liquids2004Operating

All 7 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Trenton Municipal Utilities - (MO)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
SPP
NERC region
SERC
EIA plant ID
7935

Common questions

How big is Trenton South?
14.0 MW across 7 generating units in service.
Who owns and operates it?
Operated by Trenton Municipal Utilities - (MO), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. The oldest operating units are Unit 1, Unit 2, Unit 3 and Unit 4 (2000); the newest are Unit 5, Unit 6 and Unit 7 (2004).
When is it due to retire?
No retirement date has been filed for any operating unit at Trenton South. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $13,943 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Missouri energyAll facilities in the state→Carrollton20.6 MW operating capacity→ Ozark Beach16.0 MW operating capacity→ Trenton North13.5 MW operating capacity→ Mjmeuc Generating Station 113.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming