Power·California
Tracy Renewable Power Plant
San Joaquin County, California · CAISO · operated by Tracy Renewable Energy, LLC
Capacity shown is planned or not in service
Proposed
A planned 5.0 MW other waste biomass project, filed to come online in 2027.
Planned capacity5.0MW1 unit · not yet in service
Reported suppliersNot reported2023
Location
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Who supplies the fuel
2023
No fuel deliveries are reported for 2023.
Ownership & operations
- Operating utility
- Tracy Renewable Energy, LLC
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- CAISO
- NERC region
- WECC
- EIA plant ID
- 68855
Common questions
How big is Tracy Renewable Power Plant?
5.0 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Tracy Renewable Energy, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by agricultural byproducts.