Deuel County, South Dakota
Capacity shown is planned or not in service
A planned 145 MW natural gas fired combustion turbine project, filed to come online in 2029.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit U1 | 36.3 | Natural Gas | Natural Gas Fired Combustion Turbine | 2029 | Planned |
| Unit U2 | 36.3 | Natural Gas | Natural Gas Fired Combustion Turbine | 2029 | Planned |
| Unit U3 | 36.3 | Natural Gas | Natural Gas Fired Combustion Turbine | 2029 | Planned |
| Unit U4 | 36.3 | Natural Gas | Natural Gas Fired Combustion Turbine | 2029 | Planned |
All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit U1 | new unit | 2029 | 36.3 MW |
| Unit U2 | new unit | 2029 | 36.3 MW |
| Unit U3 | new unit | 2029 | 36.3 MW |
| Unit U4 | new unit | 2029 | 36.3 MW |