AMERICAN ENERGY ATLAS
Industrial + power·Rhode Island

Toray Plastics (america), Inc.

North Kingstown, Washington County, Rhode Island · ISO-NE · operated by Toray Plastics America · owned by Toray Industries America Inc

2023 · headline year
Fuel spend$22.4M2023 · estimate
Capacity in service20.0MW3 units · gas
Net generation157GWh2023 · reported
CO₂ emitted95,864t2023 · reported to EPA · 2,494th highest of 6,030 in the US
Rank in Rhode Island#11 (tied)of 105 · by capacity · #4,406 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor90%2023

Location

Washington County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.55 TBtu · reported · $22.4M est.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 20.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CG17.5Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit KG187.5Natural GasNatural Gas Internal Combustion Engine2014Operating
Unit KG125.0Natural GasNatural Gas Internal Combustion Engine2014Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Toray Industries America Inc · 100%
Operating utility
Toray Plastics America
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1000338
Balancing authority
ISO-NE
NERC region
NPCC
Gas pipeline
Algonquin Gas Transmission Company
EIA plant ID
61857

Common questions

How big is Toray Plastics (america), Inc.?
20.0 MW across 3 generating units in service.
Who owns and operates it?
Owned by Toray Industries America Inc (100%) and operated by Toray Plastics America, filed as industrial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. The oldest operating unit is Unit CG1 (2003); the newest are Unit KG18 and Unit KG12 (2014).
When is it due to retire?
No retirement date has been filed for any operating unit at Toray Plastics (america), Inc. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $22.4M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
95,864 t in 2023, reported to the EPA — the 2,494th highest of 6,030 US facilities that reported. Up from 57,463 t in 2011.

Related pages

Rhode Island energyAll facilities in the state→Block Island Wind Farm30.0 MW operating capacity→ University Solar, LLC24.0 MW operating capacity→ GD West Greenwich Nooseneck I, LLC20.0 MW operating capacity→ Gold Meadow Farms16.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming