Capacity in service4.0MW5 units · biomass
Net generation6.91GWh2023 · reported
CO₂ emitted120,505t2023 · reported to EPA · 2,130th highest of 6,030 in the US
Rank in Arkansas#68 (tied)of 108 · by capacity · #8,041 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor20%2023

Location

Washington County · MISO · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 80,602 MMBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 4.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN10.8Landfill gasLandfill Gas2010Operating
Unit GEN20.8Landfill gasLandfill Gas2010Operating
Unit GEN30.8Landfill gasLandfill Gas2010Operating
Unit GEN40.8Landfill gasLandfill Gas2010Operating
Unit GEN50.8Landfill gasLandfill Gas2010Operating

All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1003406
Balancing authority
MISO
NERC region
SERC
Gas pipeline
Enable Gas Transmission LLC
EIA plant ID
57025

Common questions

How big is Tontitown Landfill?
4.0 MW across 5 generating units in service.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. Every operating unit came online in 2010.
When is it due to retire?
No retirement date has been filed for any operating unit at Tontitown Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much CO₂ does it emit?
120,505 t in 2023, reported to the EPA — the 2,130th highest of 6,030 US facilities that reported. Up from 108,670 t in 2011.

Related pages

Arkansas energyAll facilities in the state→White River Lock and Dam 14.3 MW operating capacity→ White River Lock and Dam 34.3 MW operating capacity→ Fayetteville Public Schools (SWEPCO)4.0 MW operating capacity→ Lrwra4.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming