Fort Meade, Polk County, Florida · FPC · operated by Duke Energy Florida, LLC · owned by Duke Energy Corp

2023 · headline year
Reported fuel cost$35.4M2023 · reported deliveries
Capacity in service278MW2 units · gas
Net generation1.13TWh2023 · reported
CO₂ emitted442,007t2023 · reported to EPA · 1,001st highest of 6,030 in the US
Rank in Florida#45of 310 · by capacity · #1,091 of 13,147 US
Reported suppliers12023 · 11 deliveries
Capacity factor46%2023

Location

Polk County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 8.76 TBtu · reported

CO₂ emitted, t · 2011–2023

0250,000500,000750,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 278 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CT1195.2Natural GasNatural Gas Fired Combined Cycle1997Operating
Unit CW182.9Natural GasNatural Gas Fired Combined Cycle1997Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
ChevronNatural gas8.79n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 143 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Florida, LLC
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001137
Balancing authority
FPC
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company, Gulfstream Natural Gas System LLC
EIA plant ID
7699

Common questions

How big is Tiger Bay Cogeneration Facility?
278 MW across 2 generating units in service.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Florida, LLC, filed as investor-owned utility.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1997. Every operating unit came online in 1997.
When is it due to retire?
No retirement date has been filed for any operating unit at Tiger Bay Cogeneration Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $35.4M in 2023.
How much CO₂ does it emit?
442,007 t in 2023, reported to the EPA — the 1,001st highest of 6,030 US facilities that reported. Down from 483,132 t in 2011.

Also at this site

Tide BaySame site · planned→

Related pages

Florida energyAll facilities in the state→Indian River (683)343 MW operating capacity→ Deerhaven326 MW operating capacity→ Santa Rosa Energy Center274 MW operating capacity→ S O Purdom270 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming