AMERICAN ENERGY ATLAS
Power·Maine

Three Rivers Solar Power, LLC

Hancock County, Maine · ISO-NE · operated by Three Rivers Solar Power, LLC

Capacity shown is planned or not in service

Proposed

A planned 100 MW solar photovoltaic project, filed to come online in 2026.

Planned capacity100MW1 unit · not yet in service

Location

Hancock County · ISO-NE · NPCC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 3RIVS100.0SolarSolar Photovoltaic2026Proposed

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit 3RIVSnew unit2026100 MW

Ownership & operations

Operating utility
Three Rivers Solar Power, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
63386

Common questions

How big is Three Rivers Solar Power, LLC?
100 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Three Rivers Solar Power, LLC, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
What does it run on?
Solar Photovoltaic (100 MW).

Related pages

Maine energyAll facilities in the state→Spencer Drive Solar OnePower facility→ Squa Pan Hydro StationPower facility→ Topsham Meadow Solar StationPower facility→ Turner Meadow Solar StationPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming